Have a Look at Our Work

East Hampton, NY East Hampton, NY

East Hampton, NY

0 1809

This East Hampton, NY project involved the selective demolition of three bedrooms to prepare the home for a full interior renovation and upgraded layout. Our team carefully removed existing wall finishes, insulation, and interior assemblies to expose the framing, plumbing, and electrical systems within each room. By taking the spaces down to the studs while protecting adjacent finished areas of the home, contractors were provided full access to update mechanical systems, improve insulation, and prepare the rooms for modern finishes and design improvements.

Mattituck, NY Mattituck, NY

Mattituck, NY

0 376
This Mattituck, NY project involved interior demolition following a water loss that impacted the home’s kitchen and lower-level living areas. After identifying the areas affected by moisture intrusion, our team carefully removed sections of the ceiling and flooring to expose the structural framing and subfloor beneath. Opening these...
Island Park, NY Island Park, NY

Island Park, NY

This Island Park, NY project involved interior demolition following a water loss that affected the home’s lower-level living area and...
0 351
Glen Head, NY Glen Head, NY

Glen Head, NY

This Glen Head, NY project involved the selective demolition of a basement bathroom to prepare the space for a complete renovation and updated...
0 144
Merrick, NY Merrick, NY

Merrick, NY

This Merrick, NY project involved a kitchen gut renovation along with selective plaster removal in the foyer and hallway areas to prepare the home...
0 242
RSS
First2345791011
Login